welcome to Shijiazhuang Shenghaowei Building Material Co., LTD 

顶部内容

Time of issue:2021-01-08 14:01:09
Shijiazhuang Shenghaowei Building Material Co., LTD
Shijiazhuang Shenghaowei Building Material Co., LTD
Shijiazhuang Shenghaowei Building Material Co., LTD
Shijiazhuang Shenghaowei Building Material Co., LTD

Detail

Construction of railway underbridge to begin in November

  • Categories:News
  • Author:
  • Origin:
  • Time of issue:2012-10-10
  • Views:

(Summary description)

Construction of railway underbridge to begin in November

(Summary description)

  • Categories:News
  • Author:
  • Origin:
  • Time of issue:2012-10-10 00:00
  • Views:
Information

  As a perfect puja gift to the denizens of the Jugsalai municipal area, the railways has announced construction work of the much-awaited railway under bridge near Tata Pigment company gate from November 2012.

Tenders, for inviting engineering firms, will be floated on November 23 and subsequently the contractual firms will be finalized in the next one week. Thereafter, the construction work will start. The construction work of Rs 5.70 crore under bridge will take over three months to complete. An engineering official in the Tatanagar railway section said, "If things go according to plan then probably by the end of the current financial year (March 31 2013) the new under bridge will be in place."

About 1.5 lakh residents of the Jugsalai and Baghbera municipal area have been facing trouble in travelling to the city, a distance of about few kilometers, for the last several decades owing to the absence of an under bridge.

 a local resident who runs a shop near the level crossing, said, "The under bridge will largely lessen the need for using the level crossing and will certainly help us in preventing fatal accidents which we have been witnessing over the years."

Several fatal accidents have occurred at the level crossing in the past years as people, in a hurry, tend to walk over the level crossing without paying attention to the approaching trains. Over two dozen trains including passenger and goods trains run on the tracks near the level crossing round the clock, each day.

Keyword:

Shijiazhuang Shenghaowei Building Material Co., LTD
E-mail: xingye@xyzschina.cn  Tel/Fax: 0086-311-68090028   Add: Huaishu Development Zone, Jinzhou city, Hebei, China
powered by www.300.cn  冀ICP备08002369号-1